君 JUNDIANSince 2014
ESC
Type a keyword, press Enter to open the first result
Home/Method
Method

Method: four steps from pilot to production

Four steps: first decide whether the work is worth doing, then run the main path on your real data, then add monitoring and rollback to production standards, and finally hand the capability and documents back to your team. Every step has a duration, actions and acceptance terms — no sign-off on demo impressions.

Three hard standards; all four steps are judged against them

01

Observable

At minimum four metrics are visible after launch: error rate, latency, retrieval hit rate, no-answer rate. If you cannot see it, it is not live.

02

Rollbackable

Every release keeps a rollback point, rehearsed before launch. What cannot be rolled back does not ship.

03

Transferable

Documents, scripts and the evaluation set are complete so your team can take over. We do not lock you in.

01

Diagnosis and planning

3–10 days

First decide whether the work is worth doing: who uses it, in which scenario, who does it now, and how often.

  • Interview business, IT and front-line users; record the scenario and how it is handled today
  • Check what data actually exists: tables, document versions, API owners, how much of it is dirty
  • Turn acceptance into measurable terms, e.g. “first bid draft from 5 days to 2”
How it passesScenario list and acceptance criteria signed off; if the case does not hold up, we say so here
DeliverableScenario list · Roadmap · Acceptance criteria
02

Rapid prototype

2–4 weeks

Run the main path on a slice of your real data — no demo environment built on fake records.

  • Connect databases, documents and APIs; one end-to-end path only
  • Build an evaluation set from 30 real questions: support tickets, rejected approvals, business queries
  • Demo weekly, including the cases that failed
How it passesMain path runs on real data; answer usability on the evaluation set reaches the agreed threshold (often ≥80%)
DeliverableDemoable prototype · Evaluation set and scores
03

Production launch

3–8 weeks

Add permissions, staged rollout, rollback and monitoring so failures surface in production instead of hiding.

  • Accounts, integration, staged rollout and rollback plan; rehearse a rollback before launch
  • Wire monitoring and alerts: error rate, latency, retrieval hit rate, no-answer rate
  • Write the ops manual and train users; make clear who to call when something breaks
How it passesFour metrics visible, rollback rehearsed, front-line staff can operate it alone
DeliverableLive system · Monitoring dashboard · Ops manual
04

Ongoing operations

Long term

Launch is the start: metrics reviewed monthly, regression run whenever knowledge changes.

  • Monthly metric review; re-run the evaluation set after every knowledge update
  • Quarterly handover: documents, scripts and the evaluation set go to your team
  • Where we maintain jointly, response times and ownership are written down
How it passesTwo consecutive months without regression; handover list signed
DeliverableMonthly report · Regression log · Handover list

How long it usually takes

Project typeTypical spanCore team
Single-domain Q&A / retrieval4–8 weeks1 FDE + 1 backend engineer
Cross-system workflow assistant (ERP / OA / CRM)8–14 weeks1 FDE + 2 engineers
Scheduling, dispatch, forecasting10–16 weeks1 FDE + algorithm + backend
GEO brand visibilityfrom 6–12 weeks, then ongoing monitoring1 content + 1 technical

Current scheduling is based on how our projects actually ran, not an optimistic promise. Every estimate is re-checked after diagnosis.

What we turn down

  • Demo-only requests without acceptance metrics: we define the metrics first, and decline if they cannot be defined.
  • Data unavailable and nobody owns the cleanup: we start with data work, and never promise the model will fix it.
  • High-risk work demanding full automation with no human check (diagnosis, contract signing): we assist and verify, we do not replace the accountable person.

Turning down work early is cheaper than delivering something nobody can use.

Questions we get asked

Do we have to run all four steps?
No. Diagnosis can stand alone, and an existing prototype can go straight to launch. We do not take projects that skip diagnosis — without acceptance criteria, the argument at the end is only about impressions.
Will you use our real data in the prototype?
Yes. Under an NDA, de-identified, in an isolated environment, only the slice needed to run the path, with no copies left behind.
Who maintains it after launch?
One of two ways: hand it to your team with two months of shadowing, or maintain it jointly with written response times.
What counts as passing acceptance?
The metric definitions are fixed in diagnosis and re-measured at launch on the same definitions. Any change is confirmed in writing, so nobody swaps the standard at the last minute.
How is this different from outsourcing?
Outsourcing delivers against a feature list. We deliver against metrics and on-site results, with engineers on site who own the outcome after launch.

Bring a real case, we will tell you whether it is worth doing

Diagnosis takes 3–10 days; you leave with a scenario list, acceptance criteria and an estimate, whether or not we work together.