Method: four steps from pilot to production
Four steps: first decide whether the work is worth doing, then run the main path on your real data, then add monitoring and rollback to production standards, and finally hand the capability and documents back to your team. Every step has a duration, actions and acceptance terms — no sign-off on demo impressions.
Three hard standards; all four steps are judged against them
Observable
At minimum four metrics are visible after launch: error rate, latency, retrieval hit rate, no-answer rate. If you cannot see it, it is not live.
Rollbackable
Every release keeps a rollback point, rehearsed before launch. What cannot be rolled back does not ship.
Transferable
Documents, scripts and the evaluation set are complete so your team can take over. We do not lock you in.
Diagnosis and planning
3–10 daysFirst decide whether the work is worth doing: who uses it, in which scenario, who does it now, and how often.
- Interview business, IT and front-line users; record the scenario and how it is handled today
- Check what data actually exists: tables, document versions, API owners, how much of it is dirty
- Turn acceptance into measurable terms, e.g. “first bid draft from 5 days to 2”
Rapid prototype
2–4 weeksRun the main path on a slice of your real data — no demo environment built on fake records.
- Connect databases, documents and APIs; one end-to-end path only
- Build an evaluation set from 30 real questions: support tickets, rejected approvals, business queries
- Demo weekly, including the cases that failed
Production launch
3–8 weeksAdd permissions, staged rollout, rollback and monitoring so failures surface in production instead of hiding.
- Accounts, integration, staged rollout and rollback plan; rehearse a rollback before launch
- Wire monitoring and alerts: error rate, latency, retrieval hit rate, no-answer rate
- Write the ops manual and train users; make clear who to call when something breaks
Ongoing operations
Long termLaunch is the start: metrics reviewed monthly, regression run whenever knowledge changes.
- Monthly metric review; re-run the evaluation set after every knowledge update
- Quarterly handover: documents, scripts and the evaluation set go to your team
- Where we maintain jointly, response times and ownership are written down
How long it usually takes
| Project type | Typical span | Core team |
|---|---|---|
| Single-domain Q&A / retrieval | 4–8 weeks | 1 FDE + 1 backend engineer |
| Cross-system workflow assistant (ERP / OA / CRM) | 8–14 weeks | 1 FDE + 2 engineers |
| Scheduling, dispatch, forecasting | 10–16 weeks | 1 FDE + algorithm + backend |
| GEO brand visibility | from 6–12 weeks, then ongoing monitoring | 1 content + 1 technical |
Current scheduling is based on how our projects actually ran, not an optimistic promise. Every estimate is re-checked after diagnosis.
What we turn down
- Demo-only requests without acceptance metrics: we define the metrics first, and decline if they cannot be defined.
- Data unavailable and nobody owns the cleanup: we start with data work, and never promise the model will fix it.
- High-risk work demanding full automation with no human check (diagnosis, contract signing): we assist and verify, we do not replace the accountable person.
Turning down work early is cheaper than delivering something nobody can use.
Questions we get asked
Do we have to run all four steps?
Will you use our real data in the prototype?
Who maintains it after launch?
What counts as passing acceptance?
How is this different from outsourcing?
Bring a real case, we will tell you whether it is worth doing
Diagnosis takes 3–10 days; you leave with a scenario list, acceptance criteria and an estimate, whether or not we work together.
