君 JUNDIANSince 2014
ESC
Type a keyword, press Enter to open the first result
Home/FDE
FORWARD DEPLOYED ENGINEER

Engineers on site, getting AI into production

Consultants hand you a plan; outsourcing hands you code. An FDE is the third option: someone sits at your desk and owns the outcome after launch.

6–12wksOn-site period
3+linesBusiness chains covered
0Data leaves your network
View cases
FDE engineer debugging alongside the business team on site
WHY ONSITE

Three things sit between pilot and production

Real data, real systems, real people — none of these can be settled over a remote call. So we put people on site and deliver week by week, not against a requirements document.

  • Data is messy and definitions vary; fields and business meaning need to be aligned face to face
  • Permissions and systems live on the intranet; accounts, logs and call chains have to be connected on site
  • The business wants to see results before adopting; progress must be demonstrable every day
Engineers and the client team working in one shared space
SIX WEEKS

Six weeks on site, with an acceptable deliverable every week

Progress is proven by something that runs, not by a weekly report.

  1. T0

    Kickoff alignment

    Lock one entry point, one main chain and a shared acceptance definition, written into the project charter.

    Output · Charter · Acceptance metrics
  2. W1

    Scenario and data inventory

    Map where data lives, who can provide it, and whether it fits; align desensitization and compliance boundaries.

    Output · Data list · Desensitization plan
  3. W2–3

    Minimum working chain

    Produce a usable answer with real data, and build a 50–100 item evaluation set at the same time.

    Output · Working prototype · Evaluation set
  4. W4–5

    System integration

    Connect accounts, permissions, tickets or CRM so the capability enters the real workflow.

    Output · Integration test environment
  5. W6

    Launch and stress test

    Roll out in grayscale, watch real usage and failure samples, and set up alerts and fallback.

    Output · Launch report · Monitoring config
  6. Ongoing

    Handover and operations

    Docs, scripts and two training rounds go to your team; we step back to second-line support.

    Output · Ops manual · Training
DELIVERABLES

What we deliver

Four kinds of output, all in your environment, all handable to your team.

01

Scenario and acceptance checklist

Turn “works well” into testable metrics: hit rate, adoption, average handling time, human fallback rate.

02

Data and knowledge pipeline

Document parsing, chunking, vectorization and incremental updates, all scripted, rerunnable and rollback-able.

03

Model and prompt engineering

Model selection by scenario, prompts, retrieval reranking and structured output, with evaluation and regression cases.

04

Monitoring and operations

Call-chain logs, failure sample feedback, cost and rate-limit strategy, with a weekly review template.

Who it suits — and who it doesn't

A good fit

  • A clear entry point: support, tickets, QC, knowledge lookup
  • Data sits on the intranet and can't move to a public cloud soon
  • Your own team should be able to take over, rather than depend on a vendor long term

Not a fit

  • Just looking for an off-the-shelf generic SaaS
  • No business-side cooperation, only IT pushing it forward
  • Expecting results in a week and unwilling to start with one scenario

FAQ

Is an FDE on site every day?

Three to four days a week on site, the rest remote; milestone reviews must be in person. Remote projects are scheduled in two-week on-site cycles.

What if data can't leave the intranet?

Full intranet deployment: the model runs on private or dedicated cloud, the vector store and evaluation data stay inside; we only take away desensitized metrics.

Can we maintain it ourselves after handover?

We deliver scripts, docs and two training rounds; your team shadows from week four, and leads in the last two weeks while we review.

How is this different from a traditional project engagement?

We deliver something runnable each week rather than accepting against a requirements document; scope is adjusted on the spot instead of going through a change process.

Let's talk through your scenario first

A 30-minute online call; we'll suggest a workable next step, and say so if it isn't a fit.