Problem
More than 90 bids a year, each technical proposal written from zero. The same project record existed in seven versions, and qualification clauses were checked by eye. One missed qualification page disqualified a bid worth eight figures.
Approach
Six years of history, 430 bids, split into scoring points and reusable paragraphs, each tagged with the scoring item, qualification level and industry it fits. Writers import the scoring table from the tender, and the assistant retrieves paragraphs, drafts the response and flags missing items in red. A separate checklist covers the disqualifiers: missing pages, wrong seals, unmet qualifications.
Result
Draft time fell from five days to two. In three months the assistant caught 32 disqualifying risks, and first-pass acceptance rose from 71% to 88%.



